7th July 2014

Smart new fillet to North side of West coping

Centre ridge capping

Cutting shop ready for stone
8th July 2014 – More stone arrives

Starting on NW valley

First strip of lead, North West valley

Lead fitting, North West valley

Foot of North West valley

Where’s the stone ?

Stone arrives!

Our new stone, from St Bee’s quarry Cumbria.

Unloading the stone

Still unloading the stone

Unloading with the crane

Putting the pallet down












All stone off the lorry

Lorry eventually gone
10th July 2014

Mullion cutting

“Raw” mullions

Cleaning up the cut face
16th July 2014

Coming down the North West valley

North West valley nearly there

Upper west wall much eroded

Holes in the windows

West window, lead eroded and glass holed

View of hall roof

View of roof with loose slates


Mullion shaped, just glazing slots to cut
17th July 2014

Mullions are go
18th July 2014

Tatty old Church sign

Taking cement off porch wall
23rd July 2014

Four down
24th July 2014

Choir vestry west

Choir vestry west

Rector’s vestry west

Rector’s vestry west

Old Tracery South Transept

Cutting Mullions

New South West valley

Glass out of West (Shacklady) window

East window through west window





27th July 2014

Choir vestry roof re-felted




Church service in the hall
30th July 2014

Tracery cutting

Final hand polish to mullion

Old north transept mullions – much wasted away

Repointing, one stone cut for indenting

Choir vestry gable reveals faults as cement removed
Click here to go back to the Photos Ardrossan Restoration Work page.